Monthly Production Report for February,2020
Crude Oil
Crude oil production[1] during February,2020 was2399.51 TMT which is16.99% lower than target and6.41% lower when compared with February2019.Cumulative crude oil production during April-February, 2019-20 was 29471.85 TMT which is 7.63% and 5.99% lower than target for the period and production during corresponding period of last year respectively.Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of February, 2020 and cumulatively for the period April-February, 2019-20 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
22153.90
|
1899.95
|
1672.96
|
1598.79
|
104.64
|
20072.45
|
18848.84
|
19273.93
|
97.79
|
OIL
|
3424.90
|
276.56
|
240.26
|
243.68
|
98.59
|
3130.67
|
2852.55
|
3015.03
|
94.61
|
PSC Fields
|
9463.34
|
714.13
|
486.29
|
721.25
|
67.42
|
8703.49
|
7770.46
|
9059.98
|
85.77
|
Total
|
35042.15
|
2890.65
|
2399.51
|
2563.72
|
93.59
|
31906.61
|
29471.85
|
31348.95
|
94.01
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
- Crude oil production by ONGC during February, 2020 was 1672.96 TMT which is 4.64% higher when compared with February,2019 but 11.95% lower than the target for the month. Cumulative crude oil production by ONGC during April-February, 2019-20 was 18848.84 TMT which is 6.10%and 2.21% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Non realization of production from WO-16 cluster due to unavailability of MOPU.
- ESP issues in wells of NBP and Ratnafields.
- Less production from B-127 Cluster due to increase in water cut.
- Increase in water cut in certain wells of Mumbai High,Heera, Neelam& B173A fields
- Crude oil production by OIL during February, 2020 was240.26 TMT which is 13.13% lower than the monthly target and 1.41% lower than the February, 2019. Cumulative crude oil production by OIL during April-February, 2019-20 was 2852.55 TMT which is 8.88% and 5.39% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover and drilling wells.
- Less than planned contribution from Old well- Rise in water cut in wells & Decline in total liquid production of wells as a consequential effect of the wells shut-in during bandhs.
- Crude oil production byPvt/JVs during February,2020 was 486.29 TMT which islower by 31.90% than the monthly target and 32.58%lowerthanFebruary, 2019.Cumulative crude oil production by Pvt/JVs during April-February, 2019-20 was 7770.46 TMT which is 10.72% and 14.23% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1: Shut down during 5thto 29thFebruary, 2020 for major plant maintenance activities. (CEIL)
- Operational issues in CB-OS/2. (CEIL)
- KG-ONN-2003/1: Less than expected production from wells. (ONGC)
- CB-ONN-2005/9: Environmental clearance issues.
- Natural Gas
Natural gas production during February,2020 was 2340.51 MMSCM which is 17.02% lower than the monthly target and 8.78% lower when compared with February, 2019. Cumulative natural gas production during April-February, 2019-20 was 28769.42MMSCM which is 8.57% and 4.29% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of February, 2020 and cumulatively for the period April-February, 2019-20 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (MMSCM)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
25848.00
|
2184.13
|
1869.97
|
1953.74
|
95.71
|
23488.80
|
21841.29
|
22539.76
|
96.90
|
OIL
|
3309.59
|
239.55
|
200.79
|
203.70
|
98.57
|
3037.94
|
2456.64
|
2486.78
|
98.79
|
PSC Fields
|
5395.20
|
396.80
|
269.76
|
408.31
|
66.07
|
4939.12
|
4471.49
|
5030.87
|
88.88
|
Total
|
34552.79
|
2820.48
|
2340.51
|
2565.75
|
91.22
|
31465.86
|
28769.42
|
30057.41
|
95.71
|
Note: Totalsmay not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
- Natural gas production by ONGC during February, 2020 was 1869.97MMSCM which is 14.38% lower than target and 4.29% lower when compared with February 2019. Cumulative natural gas production by ONGC duringApril-February, 2019-20 was 21841.29 MMSCM which is 7.01% and 3.10% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Less Gas production from Vasistha/S1 wells in EOA due sand incursion issues and from DDW No. 5 in HPHT Asset.
- Non-realization of gas production planned from WO16 cluster from Dec’19 in absence of MOPU
- Less than planned gas production from Bassein field and Daman Tapti Block.
- Less gas production due to less gas off take by Consumers, including major customers.
- Natural gas production by OIL during February, 2020 was 200.79 MMSCM which is 16.18% lower than monthly target and 1.43% lower than February, 2019. Cumulative natural gas production by OIL during April-February, 2019-20 was 2456.64 MMSCM which is 19.13% and 1.21% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production restricted due to continuation of low upliftment by BVFCL (unscheduled plant shutdown at unit II & III)
- Gas supply to LTPS suspended due to intelligent pigging workof Namrup to Lakwa gas pipe line.
- Consequential loss due to effect of bandh/blockades
- Natural gas production by Pvt/JVs during February,2020 was 269.76 MMSCM which is 32.02% lowerthan monthly target and33.93% lower than February, 2019. Cumulative natural gas production by Pvt/JVs during April-February, 2019 was 4471.49MMSCM which is 9.47% and 11.12% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Sohagpur West: Dewatering wells gas breakout awaited, slow gas ramp up in pilot wells & scaling in producing wells. (RIL)
- Raniganj East: Production reduced due to limited off take by customers and to avoid flaring. (ESSAR)
- AAP-ON-94/1: Production shortfall due low consumer demand. (HOEC)
- KG-OSN-2001/3: Production from well D5 is less than anticipated. D5 well is under observation and stabilization. (ONGC)
- Refinery Production (in terms of crude oil processed)
Refinery production during February, 2020 was 21118.17TMT which is 2.45% higher than the target for the month and5.15% higherwhen compared with February, 2019. Cumulative production during April-February, 2019-20 was233182.24 TMT which is0.71% higher than the target for the period but0.65% lower than production during corresponding period of last year respectively. Unit-wise production is given at Annexure-III. Company-wise production for the month of February, 2020 and cumulatively for the period April-February, 2019-20vis-à-Vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Refinery Production (TMT)
Oil Company
|
Target
|
February (Month)
|
April-February (Cumulative)
|
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
CPSE
|
147944.81
|
12626.06
|
12168.69
|
11939.71
|
101.92
|
134279.88
|
132454.12
|
138221.71
|
95.83
|
IOCL
|
71900.25
|
6183.32
|
5724.23
|
5519.81
|
103.70
|
65196.58
|
63683.24
|
66156.17
|
96.26
|
BPCL
|
30900.00
|
2510.00
|
2659.50
|
2521.97
|
105.45
|
28205.00
|
28825.59
|
28030.39
|
102.84
|
HPCL
|
16499.00
|
1495.00
|
1515.18
|
1466.01
|
103.35
|
14901.00
|
15665.44
|
16816.77
|
93.15
|
CPCL
|
10400.00
|
870.00
|
735.33
|
881.38
|
83.43
|
9470.00
|
9307.45
|
9690.82
|
96.04
|
NRL
|
2799.80
|
234.00
|
224.69
|
215.15
|
104.44
|
2540.70
|
2135.69
|
2654.29
|
80.46
|
MRPL
|
15400.00
|
1330.00
|
1304.21
|
1328.34
|
98.18
|
13925.00
|
12756.43
|
14815.04
|
86.10
|
ONGC
|
45.76
|
3.74
|
5.55
|
7.06
|
78.57
|
41.60
|
80.29
|
58.23
|
137.90
|
JVs
|
18755.00
|
1486.00
|
1680.43
|
1642.33
|
102.32
|
17167.00
|
18456.91
|
16391.13
|
112.60
|
BORL
|
7800.00
|
620.00
|
652.22
|
635.53
|
102.63
|
7140.00
|
7179.70
|
5013.11
|
143.22
|
HMEL
|
10955.00
|
866.00
|
1028.21
|
1006.81
|
102.13
|
10027.00
|
11277.21
|
11378.02
|
99.11
|
Private
|
88040.52
|
6501.38
|
7269.05
|
6501.38
|
111.81
|
80096.59
|
82271.22
|
80096.59
|
102.72
|
RIL
|
69145.00
|
4921.74
|
5667.78
|
4921.74
|
115.16
|
62991.09
|
63370.05
|
62991.09
|
100.60
|
EOL
|
18895.52
|
1579.65
|
1601.27
|
1579.65
|
101.37
|
17105.50
|
18901.17
|
17105.50
|
110.50
|
TOTAL
|
254740.32
|
20613.45
|
21118.17
|
20083.43
|
105.15
|
231543.47
|
233182.24
|
234709.43
|
99.35
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure 3: Monthly Refinery Production
- CPSE Refineries’ production during February, 2020 was 12168.69TMT which is 3.62% lower than the target for the month and1.92%higherwhen compared with February, 2019.Cumulative production by CPSE refineries during April-February, 2019-20 was 132454.12TMT which is 1.36% and 4.17% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall of refinery production in some CPSE refineries are as under:
- IOCL-Guwahati and Bongaigaon: Shutdown deferment.
- IOCL- Haldia: Lower due to CDU-1 Start-up delay.
- IOCL- Panipat: Lower due to AVU (Atmospheric and Vaccum Distillation Unit) shutdown for maintenance job
- CPCL-Manali: Lower due to CDU-1 outage emergency shutdown.
- NRL- Numaligarh: As per crude availability
3.2 Production in JV refineries during February, 2020 was 1680.43TMT which is 13.08% lower than the target for the month and2.32% higher when compared with February, 2019. Cumulative production by CPSE refineries during April-February, 2019-20 was 18456.91 TMT which is 7.51% and 12.60% lower than target for the period and production during corresponding period of last year respectively..
3.3 Production in private refineries during February, 2020 was 7269.05TMT which is 11.81% higher than the target as well as corresponding month of last year. Cumulative production by private refineries during April-February, 2019-20 was 82271.22 TMT which is 2.72% higher than the target as well as corresponding period of last year.
3.4 Refinery-wise details of the capacity utilization and production of petroleum products during the month of February, 2020 and cumulatively for the period April-February, 2019-20vis-à-vis April-February,2018-19 are given atAnnexures -IV and V respectively.